An example of engineering and economical comparison results form had been given. The algorithm makes it possible to adopt a scheme option, choose electrical equipment and compose switchyard single-line diagram and layout. The algorithm of economically reasonable scheme and open switchyard arrangement design had been developed. The aim of this study is to elaborate the algorithmic basis for electric power substation CAD software. To date, there is no CAD system that allows you to automate the design process of plans for outdoor switchgear substations taking into account their economic indicators and offer the designer not only a technically feasible solution, but also carry out its economic assessment on the basis of which designer is able to choose the optimal layout option. It requires the designer to know a large number of design standards, safety requirements for the switchgear and standard design decisions. Output your project to a printer or to a PDF file containing hyperlinks.The outdoor switchyard design is one of the most time-consuming stage of electric substation engineering. Output a report to a file or insert it as a table object on your drawing. Manage terminal strips with Terminal Strip Editor. Add nameplates, item numbers, and balloons.

Insert panel symbols from a list of schematic components or the panel icon menu. Modify your drawings while maintaining the intelligence needed by AutoCAD Electrical. Select a cross-reference format and add cross-referencing to your drawings. Insert wires, wire numbers, and signal arrows. Insert schematic components, generate PLC modules, insert and copy circuits. Review the basics for working in AutoCAD Electrical.Ĭreate and open projects, and manage project settings.Ĭreate drawings, add drawings to a project, and manage the drawing settings.